Top Structural Steel Connection Detail

STEEL & GLASS PEDESTRIAN BRIDGE  
BALLSTON QUARTER, ARLINGTON, VA

Client: Roschmann Group 
Architect: StudioTECHNE Architects 
Role: Facade Designer / Draftsman  
Team: Ryan Cramer, Holger Schulze-Ehring, Juan Paulino,  
Oliver Lahr (Roschmann), Patrice Couret (Roschmann)
Status: Under Construction

Renderings courtesy of StudioTECHNE Architects

New pedestrian bridge being constructed as part of the greater re-development of Arlington’s Ballston Quarter. Roschmann has been contracted to construct the steel bridge structure and glass cladding. Buro Ehring is serving in a design assist role, performing structural design and shop drawing production.

Responsibilities Include:  Drafted all design assist and shop drawing documents, including splice details, connection details, and glass fabrication piece drawings.  Built 3D fabrication level structural steel models for coordination.  Built 3D fabrication level glass connection models for coordination.  Attended ongoing pre-construction meetings with the design team.

loading ...
  • Exterior Rendering
  • Interior Rendering
  • Interior Rendering
  • Ongoing Construction Photo
  • Rhino Model - Glass and Metal Cladding
  • Rhino Model - Structural Steel
  • Central Glass Connection Mock-Up
  • Central Glass Connection Mock-Up
  • Bridge Elevation - Glass
  • Bottom Structural Steel Connection Detail
  • Bottom Structural Steel Connection Detail
  • Bottom Structural Steel Connection Detail
  • Top Structural Steel Connection Detail
  • Top Structural Steel Connection Detail
  • Top Structural Steel Connection Detail
  • Typical Steel Connection to Concrete Plinth Column Detail